Sub-slab Site Cleanup


Application Picture Gallery

5001.jpg
Drilling Contractor setting up drill to drill to a depth of 20 feet below the concrete surface
5002.jpg
The soil and groundwater under the building was contaminated with BETX, DDT, Malathion and other pesticides
5003.jpg
Soil was cored and registered at the depth groundwater was encountered which was 16 feet
5004.jpg
The impervious layer of clay was encountered at twenty feet
5005.jpg
Soil cores were sampled at every four feet to determine scope of contamination
5006.jpg
4 4"holes were drilled after core sampling was completed.
5007.jpg
OSEI Corp. puts in monitoring wells so that continuing sampling is possible, and so OSE II can be applied
5008.jpg
5 drums of OSE II were set up on a slow continuous feed into the monitoring wells
5009.jpg
OSE II was applied by a continuous slow feed because the wells could only take in so much liquid for a given time period
5010.jpg
In less than 30 days the groundwater and soil under the building were reduced to acceptable cleanup levels