Underground Storage Tank Cleanup


Application Picture Gallery

6001.jpg
Soil was excavated from area where underground storage tank had been leaking gasoline
6002.jpg
Measuring stakes were placed in areas where soil was to be extracted for testing
6003.jpg
Soil was placed back in the original hole in two foot lifts and then OSE II was applied
6004.jpg
Eight (8) two foot soil lifts were placed back in the hole and OSE II was applied each time
6005.jpg
The measuring sticks guided OSEI Corp. as to how much soil to put back and also mark soil sampling areas
6006.jpg
OSEI Corp. associate extracting soil sample to be tested
6007.jpg
OSEI Corp. associate testing soil for moisture content to make sure it had enough moisture so bacteria would have motility
6008.jpg
Soil was cleaned up and the state of Alaska issued a clean / closure letter