Current page: 30

5 Once the 55 gallon drum 2 day reduction time had elapsed samples were taken to the Trinity River waste plant laboratory to verify the waste, grease,




<--Previous  Up  Next-->

5 Once the 55 gallon drum 2 day reduction time had elapsed samples were taken to the Trinity River waste plant laboratory to verify the waste, grease,