 1A OSE II was tested to see if grease, oil, and waste could be remediated
|
 1 Trinity River Waste treatment plant personal pouring waste, oil, and grease into a 55 gallon drum in order to test OSE II
|
 2 OSE II was tested on oil and grease in a 55 gallon drum by the Trinity River Waste treatment laboratory (applying OSE II to the waste, grease, and o
|
 2/1 Once the drum test was successful a second test was initiated by the Trinity River waste treatment plant personal
|
 2/2 The second test was set up to apply OSE II onto the surface of the waste water, oil and grease inlet retention area of the waste treatment plant
|
 2/3 The inlet surface area and depth of contaminant was determined and then OSE II was applied unmixed since the water was already in the retention in
|
 2/4 The 3 gallon pump up sprayer was filled a second time to apply OSE II in order to get enough OSE II to meet the 1 to 1 application rate of OSE II
|
 2/5 Applying OSE II down 15 feet to the waste, grease and oil covered inlet surface at the Trinity Riverwaste treatment plant
|
 2/6 Applying OSE II down 15 feet to the waste, grease and oil covered inlet surface from a second area at the Trinity River Waste Treatment plant
|
 2/7 The waste, grease and oil started reducing and covered a smaller area as time passed; there was a Bboard that flowed into the inlet that seemed t
|
 2/8 The waste, grease and oil started reducing and covered a smaller area as time passed; there was a board that flowed into the inlet that seemed to
|
 2/8 After allowing OSE II to remain on the inlet water surface for 4 hours, a Trinity River Waste treatment plant stirred the waters surface with a wa
|
 2/9 Once the grease seemed to disinegrate in the inlet, the Trinity River plant personal opened up the grease seperator at the grease separation build
|
 2/10 The trinity River plant personal allowed a sample collection vessel to sink into the grease seperator to pull up a sample
|
 2/11 The Trinity River plant personal pulled the sample up from the grease separator and took the sample to the lab where it was determined that OSE I
|
 2/12 Once the inlet retention time had elapsed samples from the grease separator were taken to the Trinity river waste plant lab to verify the waste,
|
 3 Applying OSE II to the waste, oil and grease at for Trinity River Waste treatment laboratory personal
|
 3/1 Once OSE II had reduced the grease in the first two tests then OSE II was tested in the large skimmer retention ponds at the trinity River waste
|
 3/2 Once again OSE II was poured unmixed into a sprayer to be applied directly to the retention ponds., since the ponds had plenty of water
|
 3/4 The amount of surface grease, waste and oil was determined and then OSE II enough OSE II was applied to meet the 1 to 1 application ratio taking i
|
 3/5 OSE II was applied infront of the skimming wiers
|
 3/6 OSE II was applied directly near the retention pond walls
|
 3/10 Trinity River waste Treatment plant personal extracting some of the waste debris from the retention pond surface
|
 3/7 OSE II was applied to the retention pond as trinity River waste treatment plant personal looked on
|
 3/8 OSE II caused the grease and waste to start covering a smaller area in a matter of minutes with Trinity River plant personal looking on
|
 3/9 The retention ponds skim grease and debris to a collection area and after OSE II was applied the volume collecting in the collection area reduced
|
 3/11 Trinity River waste Treatment plant tested successfully OSE II's ability to remediate the grease, oil and waste from the retention pond surface
|
 3/12 OSEI Corporation officials discuss with the Trinity River personel how much OSE II to order per month
|
 4 OSE II successfully remediated the waste, the oil and started the molecular break down of the grease
|
 5 Once the 55 gallon drum 2 day reduction time had elapsed samples were taken to the Trinity River waste plant laboratory to verify the waste, grease,
|